Sons new house project

Well ive been tasked today to sort VM wiring out thats all over the place lol.
And yes you guessed it i'm ripping the lot out right back to the omnibox outside so engineer when he comes can fit all shiny new cables and that lovely rusty splitter outside that went down with the titanic ffs.
Well if your gonna get your moneys worth n all that lol :ROFLMAO:(y)

if your doing the house new then get all cabling new as well.
would be a shame if you have to rip it all up to sort out old cabling.
 
Very slowly at the min with son keep having to work away but will update on next lot of progress when i get a min coz i need 36 hrs in a day to get done what i need to with other projects and work etc lol
 