sash1
Member
I’ve moved. First nightmare. Next I need a new virgin installation. Was told 2 engineers would attend. One to do the installation from the road and one for the inside. The inside bloke comes but no bloke for the outside. Sorry he says and off he goes. New installation date is in 3 weeks time they say and the outside work will be done at some point before that date. So installation date is now this Friday. Finally two blokes turned up yesterday and said we are here to do pre installation. I wasn’t in but wife says fine. They drill a hole through my garden wall. Dig a trench through my garden. At this point my wife decides to go shopping. . They tell her they will have it all done when she gets back. When she gets back they have gone. Nothing else was done. They were supposed to be digging under the path to the house. Then presumably fitting one of those boxes to the wall ready for installation. But they have just effed off and now the engineer will turn up on Friday and say it’s not finished outside yet. I’m pulling my hair out here. Anyone got any ideas who I can talk to as all I get told is my installation will be done on Friday.