I find it hard who to believe when it all started with the prem block , a lot of peeps were saying no issue with their supplier but you get told that it WILL effect ALL eventually , can try a back up i suppose but was after a simple switch via the box rhater then having to re up scripts etc everytime im wanting to use the back up supplier lol.